Interior Build Out Begins on Shawano Hospital

Posted 16 July 2014 1:14 PM by TCAuthor3

By Jeff Maciejewski, Project Engineer, Boldt

Construction on the new ThedaCare Medical Center-Shawano is entering a new phase. With the second floor concrete pours complete, work has begun on the interior build-out, which includes everything from spray fireproofing the structural steel to applying the final coat of paint prior to owner occupancy.

Fireproofing operations are ongoing and will be for the next two months. Interior walls are being framed up in areas where the fireproofing is complete. As the walls are erected, the mechanical, electrical and plumbing contractors are proceeding with their installations.

Work on the exterior is continuing to progress. The majority of roofing will be complete by the end of the month. The masons have completed a portion of the brick veneer on the north elevation and are continuing their way around the building. By the end of the month, windows will be installed in areas where the masonry work is complete. The goal is to have the building completely enclosed by the end of November.

Archive